Solid Axis delivered a complete stormwater drainage network for a 12-plot residential development in Al Raha Beach. The project included excavation, HDPE pipeline installation, manhole construction, and final connection to the main municipal network.
All works were delivered to IDAS (Abu Dhabi Department of Municipalities and Transport) specifications and inspected by the authority before commissioning.
Scope of Work
- Excavation and dewatering
- HDPE pipe installation (225mm — 600mm diameter)
- 42 precast concrete manholes
- Catch basins and grated covers
- Connection to main stormwater trunk
- Reinstatement of asphalt and interlock